Achieving and verifying design intent: It takes a team

Summary

Discusses the importance of the right process and teamwork when implementing a successful large-scale integrated network-based control system.  Addresses: focus on design intent, developing and communicating design intent, highlighting and protecting design intent during procurement, realising design intent throughout construction, and demonstrating and verifying design intent.

Primary Author(s): Hartman T.

Source: Supplement to Heat. Pip. Air Condit. Engng., July 2002.  Networked controls, 14-18, 1 fig.

             BSRIA Abstract Doc 000104205 Abs 20022640

For more information on this source please contact www.bsria.co.uk

 

Tell Us What You Think

Do you have a review, update or anything you would like to add to this article?

Leave your feedback
Submit